Skip links

Maritime Services – Case Study

Optimizing the design of a 20m fishing trawler for JJ Marines

The fishing trawler built by JJ Marines has 350hp engine and an average speed of 10knots but even after upgrading the engine to 450 hp the trawler couldn't reach the desired speed of 12knots. As per the clients request CFD simulations were done to optimize the design to reach the desired speed without any loss in stability.

Leave a comment